ΤΕΧΝΙΚΑ ΕΓΓΡΑΦΑ
Name and description: | Report 1.2.1. Construction of microventilated roofs with dry fixing of the tiles. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.1. Construcción de cubiertas microventiladas con fijación en seco de tejas. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.2. Roof tile installation process with mortar. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.2. Proceso de colocación de teja con mortero. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.3-4. Construction of large and small format walls and brick partitions |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.3-4. Ejecución de paredes separadoras y tabiques de ladillo de gran formato y de pequeño formato. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.5-6. Execution of self-supporting façade with ventilated and non-ventilated brick exposed face. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.5-6. Ejecución de fachada autoportante de ladrillo cara vista ventilada y no ventilada. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.7. Ceramic floor laying process. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.7. Proceso de colocación de suelo cerámico. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.8. Installation process of ceramic floor over existing floor. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.8. Proceso de instalación de suelo cerámico sobre suelo existente. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.9. Technical or floating floor installation process. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.9. Proceso de instalación de suelo técnico o flotante. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.10. Mosaic tile installation process. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.10. Proceso de colocación de mosaico. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.11. Building walls with ceramic block. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.11. Ejecucíon de muros con bloque cerámico. |
Upload by: | HISPALYT |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.2.12. Laying process of ceramic pavers on sand bed. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Informe 1.2.12. Ejecución de pavimento con adoquín cerámico con cama de arena. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/08/28 |
Name and description: | Report 1.5.1. Clay Placing Course Curriculum based on Ecological Challenges and BIM technologies. |
Upload by: | CTM |
Language available: | |
Date: | 2018/12/03 |
Name and description: | Report 1.5.1. Plan formativo para el curso de colocación de productos de arcilla basado en desafíos ecológicos y tecnologías BIM. |
Upload by: | CTM |
Language available: | |
Date: | 2018/12/03 |
Name and description: | Report 1.5.1. Curriculo do curso de aplicaçao de materiais de argila com base em desafios ambientais e technologias BIM. |
Upload by: | CTCV |
Language available: | |
Date: | 2018/12/03 |
Name and description: | Report 1.5.1. Σχέδιο σχηματισμού παραγόμενης από προϊόντα κολύμβησης των προϊόντων της βασικής τεχνολογίας BIM. |
Upload by: | iED |
Language available: | |
Date: | 2018/12/03 |
Name and description: | Report 3.1. IT production of the OER. |
Upload by: | CTM |
Language available: | |
Date: | 2019/05/15 |
Name and description: | Report 2.1. IT production of BIMclay Multimedia Cards. |
Upload by: | CTM |
Language available: | |
Date: | 2019/05/23 |
Name and description: | Report 2.2. Interactive BIM Tool |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/02 |
Name and description: | Report 2.3. Pedagogical test and implementation of IT improvements of BIMclay Multimedia Cards. |
Upload by: | APICER |
Language available: | |
Date: | 2019/12/20 |
Name and description: | Report 2.4. Technical test and implementation of IT improvements of BIMclay Multimedia Cards. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | Report 3.2. Pilot Clay Placing Course implementation: environment test and technical improvements. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 01. Translation of animation Roof dry tiling process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 02. Translation of animation Tile installation process with mortar. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 03. Translation of animation Construction of large format hollow brick masonry walls. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 04. Translation of animation Constructive details of large format hollow brick masonry walls. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 05. Translation of animation Ventilated façade construction process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 06. Translation of animation Non-ventilated façade construction process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 07. Translation of animation Ceramic floor laying process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 08. Translation of animation Installation process of ceramic floor over existing floor. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 09. Translation of animation Technical or floating floor installation process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 10. Translation of animation Mosaic tile installation process. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 11. Translation of animation Ventilated external wall cladding. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |
Name and description: | 12. Translation of animation Laying process of ceramic pavers on sand bed. |
Upload by: | CTM |
Language available: | |
Date: | 2019/12/20 |